โ ๏ธ Latest Violations (5)
Unknown
FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED - Comments: REPAIR INTERIOR OF CABINETS INSIDE MED ROOMS, CAP UNUSED GARBAGE DISPOSAL ON TOP AND BOTTOM TO MAKE SMOOTH AND EASILY CLEANBALE.
Unknown
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED - Comments: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. PROVIDE FLOOR TILES FOR MISSING SECTIONS IN DRY FOOD STORAGE ROOM, CLEAN FLOORS THROUGHOUT PREMISES ALONG WALL BASE IN BASEMENT, BOILER ROOM, STORAGE ROOMS, DISH MACHINE AREA, AROUND VENDING MACHINES IN DINING ROOM, REPAIR FLOOR SECTIONS IN POOR REPAIR INSIDE WALK-IN COOLER AND WALK-IN FREEZER, REPAIR FLOOR SECTIONS BEHIND METAL FOOD CAN STORAGE RACKS IN DRY FOOD STORAGE ROOM AND PROVIDE FLOOR TILES IN DISH MACHINE.
Unknown
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: The walls and ceilings shall be in good repair and easily cleaned. CLEAN WALL SECTIONS UNDER TWO AND THREE COMPARTMENT SINK, REPLACE WATER DAMAGED CEILING PANELS AS NEEDED THROUGHOUT PREMISES ESPECIALLY IN KITCHEN/DISH MACHINE ROOM AND TOILET ROOMS. SEAL CRACKS/CREVICES ALONG WALL BASE IN BASEMENT, SEAL OPENINGS AROUND ALL PIPING AND CONDUITS IN TOILET ROOMS IN BASEMENT AND WALL BASE IN STORAGE ROOM NEXT TO KITCHEN. REPAIR LARGE OPENINGS IN UTILITY ROOM ON 1ST. FLOOR.
Unknown
TOILET ROOM DOORS SELF CLOSING: DRESSING ROOMS WITH LOCKERS PROVIDED: COMPLETE SEPARATION FROM LIVING/SLEEPING QUARTERS - Comments: Toilet rooms shall be completely enclosed. PROVIDE SELF CLOSING DEVICES TO TOILET ROOM DOORS IN MEN AND WOMENS TOILET ROOMS AS NEEDED ON 1ST.-2ND FLOOR.
Unknown
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED - Comments: REPAIR LEAKS AT HOT WATER HANDLE AT UTILITY SINK ON 1ST FLOOR. PROVIDE HOT WATER AT TWO COMPARTMENT SINK AT MED ROOM ON 1ST. FLOOR, PROVIDE COLD WATER HANDLE AT WASH BOWL IN WOMENS TOILET ROOM IN BASEMENT, INCREASE HOT AND COLD WATER PRESSURE AT WASHBOWL IN SHORT END SHOWER/TOILET ROOM ON 3RD. FLOOR.