โ ๏ธ Latest Violations (2)
Unknown
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED - Comments: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. The floor in the prep area where the candied nuts and toasting dried chilies are prepared has rough seams, reseal the floor so it is smooth and sanitary.
Unknown
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: The walls and ceilings shall be in good repair and easily cleaned. The wall seams on either side of the preparation area have exposed insulation and the sides and baseboard are not coved, seal and cove said areas to protect food product and ease cleaning.