โ ๏ธ Latest Violations (2)
Unknown
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED - Comments: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. MUST REPLACE BROKEN FLOOR TILES AND CLEAN FLOOR THRU-OUT, INCLUDING BASEMENT.
Unknown
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: The walls and ceilings shall be in good repair and easily cleaned. MUST SEAL OPENINGS THRU-OUT ON WALLS AND CEILING AND REPLACE DAMAGED CEILING TILES.