โ ๏ธ Latest Violations (5)
Unknown
FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED - Comments: RAW WOOD BASE NOT COMPLETELY SEALED, INSTRUCTED TO SEAL SAID BASE.
Unknown
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS - Comments: OPEND WALL UNDER THE MOP SINK INSTRUCTED TO SEAL,SURFACE MUST BE SMOOTH,CLEANABLE AND NON-ABSORBENT MATERIAL.
Unknown
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED - Comments: MOP SINK HAS A FAUCET WITH THREADS.INSTRUCTED TO REPLACE WITH A FAUCET WITHOUT THREADS.
Unknown
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED - Comments: VENTILATION NOT PROVIDED AT STAFF WASHROOM,INSTRUCTED TO PROVIDE.
Unknown
PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED - Comments: A LOT OF CONSTRUCTION MATERIAL STORED ON FLOOR IN BASEMENT AREA WERE HOT WATER TANK IS STORED,INSTRUCTED TO ELEVATE ITEMS.